Drivers are being advised to plan ahead as an overbridge on the A40 will close in both directions for more than two months to allow essential renewal works to take place.
According to Traffic Wales, the overbridge at Pitt Village on the A40 will be closed in both directions from Monday 6 July until Monday 14 September 2026.
The closure is required to enable essential renewal works to be carried out safely.
A signed diversion route will be in place throughout the works, and motorists are being urged to allow extra time for their journeys and follow the official diversion.
Traffic Wales has published a diversion map to help drivers plan ahead before travelling.
The works are expected to remain in place until 14 September, after which the overbridge is due to reopen to traffic.
