Close Menu
    Facebook X (Twitter) Instagram
    Wales 247
    • Cymru
    • FindMyTown
      • South East Wales
      • South West Wales
      • Mid & West Wales
      • North East Wales
      • North West Wales
    • Business
    • Education
    • What’s On
    Facebook X (Twitter) LinkedIn
    • Senedd 2026
    • Cardiff
    • Swansea
    • Charity
    • Motoring
    • Got a story?
    • Advertise
    • Property
    • Cornered
    • Life
    Wales 247
    Home » First phase of Singleton Hospital upgrade starts this month
    Health

    First phase of Singleton Hospital upgrade starts this month

    Rhys GregoryBy Rhys GregoryJuly 3, 2019No Comments
    Share Facebook Twitter Copy Link LinkedIn Email WhatsApp
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    Work to improve the exterior of Singleton Hospital’s main block will start this month at a cost of around £400,000, with Welsh Government support.

    [aoa id=”1″]

    The project involves removing the cladding to the side elevations of the main block, and disruption will be kept to a minimum.

    It will take 20 weeks to complete. However it is only the first phase of a multi-million pound project to replace all cladding on the main block.

    [/aoa]

    Recent tests have identified some structural-related issues with the cladding installation.

    Preparatory work will begin during the week beginning Monday 8th July, with work to remove the side cladding following on Monday 15th July.

    The health board’s Assistant Director of Strategy Simon Davies said: “Some of the steel frame support was found to be corroded from the rain and salt coming in from the seafront.

    “The work will involve removing the terracotta tiles and steel frame support from the existing external brick wall.

    “The existing structure is safe but is not considered durable in the long term.”

    An issue with the cladding to the front of the block was identified after the health board carried out tests in the wake of the Grenfell tragedy.

    Mr Davies said it was not the same cladding as the aluminium composite material used on Grenfell Tower

    “However, during the tests and inspections experts carried out on our behalf following the tragic events in London, we became aware that the cladding was not suitable for the hospital’s main block.

    “It was intended for buildings up to a maximum of 18 metres in height, whereas Singleton is in excess of 30 metres.

    “The advice to the health board was that it should be replaced due to non-compliance with building regulations.”

    The use of the existing cladding was based on external advice and this is now the subject of ongoing discussions.

    Mr Davies said: “Design work is likely to take around eight months with a replacement period of 18 months.

    “This will be confirmed when we have appointed a main contractor to undertake the design and work package.

    “The health board is working with the Welsh Government on developing a business case. Subject to approval, we would hope that this work will start during the early part of 2020.

    “In the meantime we would like to assure patients, staff and visitors that there is no cause for concern over the cladding used at Singleton.

    “We also have robust procedures in place in the event of a fire. This was demonstrated during the fire on Ward 12 in March when everyone was evacuated promptly and safely.”

    Singleton Hospital
    Follow on Facebook Follow on X (Twitter) Follow on LinkedIn
    Share. Facebook Twitter LinkedIn Email WhatsApp Copy Link
    Avatar photo
    Rhys Gregory
    • X (Twitter)
    • Instagram
    • LinkedIn

    Editor of Wales247.co.uk

    Related Posts

    Everything you need to know ahead of IRONMAN 70.3 Swansea this weekend

    July 10, 2026

    New proposals aim to curb youth vaping across Wales

    July 10, 2026

    Even small increases in exercise can boost health, experts say

    July 10, 2026

    Comments are closed.

    Latest News in Wales

    Bastille delight Cardiff Castle crowd with hit-filled return to Depot Live

    July 11, 2026

    Wales’ best building projects recognised at RICS Awards 2026

    July 10, 2026

    Long delays after collision on M48 Second Severn Crossing

    July 10, 2026

    South Wales fire engines donated to Ukraine in latest aid convoy

    July 10, 2026

    Major milestone reached in £15m Haverfordwest Castle transformation

    July 10, 2026

    Young women from across North Wales explore future careers in tech

    July 10, 2026

    Cardiff leisure centre to open brand new soft play attraction

    July 10, 2026

    Techniquest revives fan favourites as it celebrates 40 years

    July 10, 2026

    Cardiff pupils create sustainable fashion show from donated clothes

    July 10, 2026

    Everything you need to know ahead of IRONMAN 70.3 Swansea this weekend

    July 10, 2026
    Follow 247
    • Facebook
    • Twitter
    • YouTube
    • LinkedIn

    247 Newsletter

    Sign up to get the latest hand-picked news and stories from across Wales, covering business, politics, lifestyle and more.

    Wales247 provides around the clock access to business, education, health and community news through its independent news platform.

    Email us: [email protected]
    Contact: 02922 805945

    Facebook X (Twitter) YouTube LinkedIn RSS
    More
    • What’s On Wales
    • Community
    • Education
    • Health
    • Charity
    • Cardiff
    • Swansea
    Wales Business
    • Business News
    • Awards
    • Community
    • Events
    • Opinion
    • Economy
    • Start-ups
    • Home
    • About
    • Advertise
    • Picture Desk
    • Privacy
    • Corrections
    • Contact
    © 2026 Wales 247.

    Type above and press Enter to search. Press Esc to cancel.