Close Menu
    Facebook X (Twitter) Instagram
    Wales 247
    • Cymru
    • FindMyTown
      • South East Wales
      • South West Wales
      • Mid & West Wales
      • North East Wales
      • North West Wales
    • Business
    • Education
    • What’s On
    Facebook X (Twitter) LinkedIn
    • Senedd 2026
    • Cardiff
    • Swansea
    • Charity
    • Motoring
    • Got a story?
    • Advertise
    • Property
    • Cornered
    • Life
    • World
    Wales 247
    Home » Improvement work to pedestrian crossing point on Queensway, Newport
    Community

    Improvement work to pedestrian crossing point on Queensway, Newport

    Rhys GregoryBy Rhys GregoryApril 7, 2025No Comments
    Share Facebook Twitter Copy Link LinkedIn Email WhatsApp
    Credit: Newport Council
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link
    Work has started this week on improving the pedestrian crossing by the entrance to Newport railway station on Queensway.
    The crossing point is being upgraded and widened to meet active travel standards. The central islands will be removed, a new cycle crossing point will be installed, and there will also be improvements made to the drainage around the crossing.

    Removal of the central islands will make the crossing point safer to use, with crossers no longer having to navigate three separate bits of the road, or wait at either of the islands.

    The upgrades are part of our work on improving active travel links between the city centre, railway station and the area around Queen’s Hill.

    This work has already seen us install an active travel bridge over the railway, linking Devon Place and Mill Street with the city centre, as well as an active travel crossing point linking the bridge with Cambrian Road, which the new crossing point will look like.

    “This work is another vital upgrade in making sure our highway network is fit for future generations,” said Councillor Rhian Howells, cabinet member for infrastructure and assets.

    “By replacing the outdated set-up of the existing crossing, we are ensuring that new crossing will be easier for all users to navigate, whether on foot, on a bike or in a wheelchair.

    “I’m looking forward to seeing the work once it is complete!”

    The work is anticipated to take about five to six weeks to complete, and there will be some disruption on Queensway while it is carried out.

    Pedestrians

    For pedestrians, footpaths around the crossing point may be closed at certain periods. Please use alternative routes which will be signposted.

    A temporary pedestrian crossing point will be installed close to the work site. The other crossing point on Queensway is also available.

    Road users

    To allow the work on the crossing to be carried out, there will be lane closures in place on Queensway.

    Most of the time, one lane will be open in each direction during the works.

    Occasionally, there may be some overnight closures of the entire road. These are planned for Sundays, from 12am until 4.30am. Any such full closure will be signposted well in advance and communicated out via our social media channels.

    Follow on Facebook Follow on X (Twitter) Follow on LinkedIn
    Share. Facebook Twitter LinkedIn Email WhatsApp Copy Link
    Avatar photo
    Rhys Gregory
    • X (Twitter)
    • Instagram
    • LinkedIn

    Editor of Wales247.co.uk

    Related Posts

    – Pontsticill Road to remain closed until March 2027 for major works

    September 25, 2026

    Newport city centre festival to kick-start countdown to Eisteddfod yr Urdd

    September 25, 2026

    Gemma Charnock appointed chair of Neath Port Talbot Culture Partnership

    September 25, 2026

    Comments are closed.

    Latest News in Wales

    Anthony Joshua vs Tyson Fury fight confirmed for Cardiff

    September 25, 2026

    – Pontsticill Road to remain closed until March 2027 for major works

    September 25, 2026

    Newport city centre festival to kick-start countdown to Eisteddfod yr Urdd

    September 25, 2026

    £575,000 funding pot opens for community organisations in Neath Port Talbot

    September 25, 2026

    More than 30 Pembrokeshire schools join Young Ambassadors training day

    September 25, 2026

    Gemma Charnock appointed chair of Neath Port Talbot Culture Partnership

    September 25, 2026

    Bridgend residents invited to find out how to become a councillor

    September 25, 2026

    New Blaenavon mural to celebrate town’s floral heritage

    September 25, 2026

    Inspirational learners celebrated at Wales’ 2026 Adult Learning Awards

    September 25, 2026

    Welsh businesses using AI report major gains in efficiency and innovation

    September 25, 2026
    Follow 247
    • Facebook
    • Twitter
    • YouTube
    • LinkedIn

    247 Newsletter

    Sign up to get the latest hand-picked news and stories from across Wales, covering business, politics, lifestyle and more.

    Wales247 provides around the clock access to business, education, health and community news through its independent news platform.

    Email us: [email protected]

    Facebook X (Twitter) YouTube LinkedIn RSS
    More
    • What’s On Wales
    • Community
    • Education
    • Health
    • Charity
    • Cardiff
    • Swansea
    Wales Business
    • Business News
    • Awards
    • Community
    • Events
    • Opinion
    • Economy
    • Start-ups
    • Home
    • About
    • Advertise
    • Picture Desk
    • Privacy
    • Corrections
    • Contact
    © 2026 Wales 247.

    Type above and press Enter to search. Press Esc to cancel.