Close Menu
    Facebook X (Twitter) Instagram
    Wales 247
    • Cymru
    • FindMyTown
      • South East Wales
      • South West Wales
      • Mid & West Wales
      • North East Wales
      • North West Wales
    • Business
    • Education
    • What’s On
    Facebook X (Twitter) LinkedIn
    • Cardiff
    • Swansea
    • Christmas
    • Charity
    • Motoring
    • Got a story?
    • Advertise
    • Property
    • Cornered
    • Life
    Wales 247
    Home » Further overnight road closure planned for paper mills resurfacing work
    Bridgend

    Further overnight road closure planned for paper mills resurfacing work

    Rhys GregoryBy Rhys GregoryOctober 29, 2021No Comments
    Share Facebook Twitter Copy Link LinkedIn Email WhatsApp
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    Drivers are being warned that a further overnight road closure will soon take place as part of resurfacing works along a stretch of the A4063 near Maesteg.

    Part of the WEPA Paper Mills’ ongoing £100m expansion, work was due to be completed last week but poor weather and plant operational issues meant the work was unable to be finished.

    The rescheduled work is expected to take place on 8 November between 11pm and 4am the following day. This will affect the A4063 from the layby opposite the paper mills to the Cefn Ydfa access. With a temporary diversion route in place along the A4063, B4281, A4107 and B4282, the closure hours have been carefully selected to minimise disruption and inconvenience for drivers.

    While the works are planned for one night, should the weather become an issue they may need to be delayed again, with the 9th and 10th of November being set aside for reserve dates – between the same time slot. Signing will be erected should there be these delays.

    The resurfacing work is part of the paper mills’ ongoing £100m expansion and will see the construction of a new entrance into the site. The local authority approved expansion plans which will safeguard 270 existing jobs and create 54 new roles.

    Once the work is complete, the site is expected to produce an additional 65,000 tons of toilet paper and kitchen towels for the British market each year.

    As part of the plans, WEPA is also contributing £80,000 towards new traffic calming measures on the A4063 at Coytrahen and plans for a new active travel route for the Llynfi Valley.

    Unfortunately due to the weather and a temporary plant operational issue, these works were unable to be completed and are now due to be concluded next week.

    As a key route in and out of Maesteg, the local authority and contractors for the paper mills are making every effort to ensure disruption is kept to a minimum while these vital works are undertaken.

    Councillor Stuart Baldwin, Cabinet Member for Communities

    Follow on Facebook Follow on X (Twitter) Follow on LinkedIn
    Share. Facebook Twitter LinkedIn Email WhatsApp Copy Link
    Avatar photo
    Rhys Gregory
    • X (Twitter)
    • Instagram
    • LinkedIn

    Editor of Wales247.co.uk

    Related Posts

    Changes confirmed to Bridgend Council Cabinet structure

    December 19, 2025

    A477 delays expected during essential works on Westfield Pill Bridge

    December 19, 2025

    Bus timetable changes confirmed for Pembrokeshire services

    December 18, 2025

    Comments are closed.

    Latest News in Wales

    Cardiff man jailed for cryptocurrency investment scam

    December 19, 2025

    Llandudno Junction man jailed for drug supply offences

    December 19, 2025

    Changes confirmed to Bridgend Council Cabinet structure

    December 19, 2025

    Cardiff Bay flats become first homes powered by council heat network

    December 19, 2025

    Soft plastic kerbside recycling trial in Swansea extended into 2026

    December 19, 2025

    Flood assistance centre opens in Briton Ferry for affected residents

    December 19, 2025

    A477 delays expected during essential works on Westfield Pill Bridge

    December 19, 2025

    New school names approved for Glyn-coch and Clydach Vale

    December 19, 2025

    Green light for next phase of 152 home development at former Windsor Colliery

    December 19, 2025

    Ysgol Bro Caereinion removed from Estyn review list after positive progress

    December 19, 2025
    Follow 247
    • Facebook
    • Twitter
    • YouTube
    • LinkedIn

    247 Newsletter

    Sign up to get the latest hand-picked news and stories from across Wales, covering business, politics, lifestyle and more.

    Wales247 provides around the clock access to business, education, health and community news through its independent news platform.

    Email us: [email protected]
    Contact: 02922 805945

    Facebook X (Twitter) YouTube LinkedIn RSS
    More
    • What’s On Wales
    • Community
    • Education
    • Health
    • Charity
    • Cardiff
    • Swansea
    Wales Business
    • Business News
    • Awards
    • Community
    • Events
    • Opinion
    • Economy
    • Start-ups
    • Home
    • About
    • Advertise
    • Picture Desk
    • Privacy
    • Corrections
    • Contact
    © 2025 Wales 247.

    Type above and press Enter to search. Press Esc to cancel.