Close Menu
    Facebook X (Twitter) Instagram
    Wales 247
    • Cymru
    • FindMyTown
      • South East Wales
      • South West Wales
      • Mid & West Wales
      • North East Wales
      • North West Wales
    • Business
    • Education
    • What’s On
    Facebook X (Twitter) LinkedIn
    • Senedd 2026
    • Cardiff
    • Swansea
    • Charity
    • Motoring
    • Got a story?
    • Advertise
    • Property
    • Cornered
    • Life
    Wales 247
    Home » Talyllyn Railway reveals plans for new engineering works
    Mid & West Wales

    Talyllyn Railway reveals plans for new engineering works

    Rhys GregoryBy Rhys GregoryJuly 4, 2018No Comments
    Share Facebook Twitter Copy Link LinkedIn Email WhatsApp
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    Preliminary plans for new engineering works on the world’s first preserved railway in Mid Wales have been described as “a once in a generation opportunity”.

    Talyllyn Railway Company Board and Talyllyn Railway Preservation Society Council have both endorsed a working group report which recommends acquiring land adjacent to the railway on Tywyn Pendre Enterprise Park to build the new works.

    Both organisations have stressed that the plans are at an early stage and that many challenges must be overcome to deliver the project.

    The new facility would be the railway’s engineering base for all major locomotive and rolling stock work including a paintshop and the main access point for deliveries, exchanges of locomotives and rolling stock.

    Back on the existing Pendre site, where the locomotive running shed would remain, the report recommends the redevelopment of the existing facilities, built in the 1950s and ‘60s, on the north side of the line to provide additional carriage storage, modern mess facilities and office space.

    The final part of the proposal would see the original 19th century workshop and locomotive shed building, along with the south carriage shed, restored and refurbished. A limited engineering facility would still be provided on site to deal with running repairs and a heritage engineering display created with access for passengers.

    Railway general manager, Stuart Williams, said:

    “This report is the culmination of several years of discussions about the provision of new engineering facilities. We are conscious of the historic nature of the current site, but its limitations mean that we cannot develop it in the way we would like.

    “The acquisition of a new site would give us the opportunity to develop new facilities which will last us well into the future. However, it is important to stress that this is very much still at the concept stage at this time and there are many hurdles to overcome before we can produce definitive plans.”

    Talyllyn Railway Preservation Society chairnan, Ian Drummond, said:

    “For anyone who visits our current works at Tywyn Pendre, the limitations of the site are all too clear and so the need to provide a new first class facility has been obvious for some time.

    “This proposal would have far reaching benefits not only in terms of a new engineering facility but also it could free up space elsewhere on the railway to allow other plans to be developed.

    “There will be many challenges, not least the raising of the necessary funds, but this has the potential to be a once in a generation opportunity to provide the facilities we need.”

    Further details of the proposal are expected to be revealed at Talyllyn Railway Preservation Society’s annual meeting in September.

    Talyllyn Railway
    Follow on Facebook Follow on X (Twitter) Follow on LinkedIn
    Share. Facebook Twitter LinkedIn Email WhatsApp Copy Link
    Avatar photo
    Rhys Gregory
    • X (Twitter)
    • Instagram
    • LinkedIn

    Editor of Wales247.co.uk

    Related Posts

    Royal visit announced for Royal Welsh Show 2026

    June 25, 2026

    Ceredigion prepares to welcome Britain’s top cyclists this weekend

    June 25, 2026

    Couple turn redundancy into award winning luxury cabin in Mid Wales

    June 25, 2026

    Comments are closed.

    Latest News in Wales

    Thomas Carroll tops £16.2 million turnover following year of growth

    June 26, 2026

    Chester Market traders thriving after move to £72m Northgate development

    June 26, 2026

    Newport McDonald’s unveils fresh new look following refurbishment

    June 26, 2026

    New awards to celebrate outstanding customer service across the region

    June 26, 2026

    Carbon neutral charity ball delivers £8,000 boost for good causes

    June 26, 2026

    Work begins on major 2,500 home development in North East Cardiff

    June 26, 2026

    McFly thrill Cardiff Castle crowd with nostalgia packed performance

    June 26, 2026

    Pete Tong brings Ibiza Classics party to packed Llangollen Pavilion

    June 26, 2026

    Sphere Solutions expands national reach with acquisition

    June 26, 2026

    Ancient Egyptian artefact goes on display in Swansea exhibition

    June 26, 2026
    Follow 247
    • Facebook
    • Twitter
    • YouTube
    • LinkedIn

    247 Newsletter

    Sign up to get the latest hand-picked news and stories from across Wales, covering business, politics, lifestyle and more.

    Wales247 provides around the clock access to business, education, health and community news through its independent news platform.

    Email us: [email protected]
    Contact: 02922 805945

    Facebook X (Twitter) YouTube LinkedIn RSS
    More
    • What’s On Wales
    • Community
    • Education
    • Health
    • Charity
    • Cardiff
    • Swansea
    Wales Business
    • Business News
    • Awards
    • Community
    • Events
    • Opinion
    • Economy
    • Start-ups
    • Home
    • About
    • Advertise
    • Picture Desk
    • Privacy
    • Corrections
    • Contact
    © 2026 Wales 247.

    Type above and press Enter to search. Press Esc to cancel.