Close Menu
    Facebook X (Twitter) Instagram
    Wales 247
    • Cymru
    • FindMyTown
      • South East Wales
      • South West Wales
      • Mid & West Wales
      • North East Wales
      • North West Wales
    • Business
    • Education
    • What’s On
    Facebook X (Twitter) LinkedIn
    • Senedd 2026
    • Cardiff
    • Swansea
    • Charity
    • Motoring
    • Got a story?
    • Advertise
    • Property
    • Cornered
    • Life
    Wales 247
    Home » Half term closure of Miskin Road and Mountain Ash Cross Valley Link
    Rhondda Cynon Taf

    Half term closure of Miskin Road and Mountain Ash Cross Valley Link

    Rhys GregoryBy Rhys GregoryOctober 18, 2021No Comments
    Share Facebook Twitter Copy Link LinkedIn Email WhatsApp
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    RCT Council is advising residents and road users of remedial work required at Miskin Road in Mountain Ash, which also requires day-time closures of the Cross Valley Link – scheduled for the school half term to minimise disruption.

    The Mountain Ash Cross Valley Link opened to motorists, cyclists and pedestrians in October 2020, as the Council delivered the multi-million pound new link road which has vastly improved traffic flow within local communities.

    A series of follow-up works are now required in order to correct defects at Miskin Road – including resurfacing sections of the carriageway, inspecting chamber and kerb repairs, and bridge deck drainage repairs. This will be carried out by the Council’s contractor for the overall scheme, Walters-Sisk – at no cost to the Council.

    As a result, the new two-way section of Miskin Road and the Cross Valley Link will close from Monday, October 25, (9am to 4.30pm), for around three days. The necessary closure is scheduled for the school half term period, and outside of peak hours, to minimise disruption.

    An alternative route for motorists, from Miskin Road, will be via Oxford Street, Commercial Street, High Street, Llanwonno Road, Hawthorn Terrace, Glamorgan Street, Abercynon Road and Penrhiwceiber Road.

    From the opposite side of the closure, proceed via Penrhiwceiber Road, Abercynon Road, Glamorgan Street, Hawthorn Terrace, Llanwonno Road, High Street. Commercial Street, Oxford Street, Henry Street and Miskin Road.

    For motorists travelling between Miskin Road and the A4059, an alternative route will be via New Road (A4059), Frwd Crescent, Mountain Ash Town Centre Bridge, Commercial Street, High Street, Llanwonno Road, Hawthorn Terrace, Glamorgan Street, Abercynon Road and Penrhiwceiber Road.

    Access to all residential properties will be maintained throughout the works, while pedestrian access across the Cross Valley Link Road will also remain available at all times. The Council is currently finalising a shuttle bus arrangement, to service the bus stops missed due to the traffic diversions. Further information about this temporary service will be communicated to residents in due course.

    The contractor will have site offices located near to its former compound area on the Cwm Cynon Industrial Estate, which it used throughout the duration of the main construction works. Residents and businesses are welcome to contact [email protected] (07741 265919) or [email protected] (07977 197150) with any queries.

    Follow on Facebook Follow on X (Twitter) Follow on LinkedIn
    Share. Facebook Twitter LinkedIn Email WhatsApp Copy Link
    Avatar photo
    Rhys Gregory
    • X (Twitter)
    • Instagram
    • LinkedIn

    Editor of Wales247.co.uk

    Related Posts

    Former M&S site in Pontypridd opens as new riverside public space

    June 25, 2026

    Heritage rail services cancelled as extreme heat hits North Wales

    June 24, 2026

    Full list of Rhondda Cynon Taf school closures during Wales heatwave

    June 24, 2026

    Comments are closed.

    Latest News in Wales

    South Wales Police investigating after two Cardiff teenagers arrested in Thailand

    June 27, 2026

    More than 30,000 fans turn out for Teddy Swims at Cardiff’s Blackweir

    June 27, 2026

    Thomas Carroll tops £16.2 million turnover following year of growth

    June 26, 2026

    Chester Market traders thriving after move to £72m Northgate development

    June 26, 2026

    Newport McDonald’s unveils fresh new look following refurbishment

    June 26, 2026

    New awards to celebrate outstanding customer service across the region

    June 26, 2026

    Carbon neutral charity ball delivers £8,000 boost for good causes

    June 26, 2026

    Work begins on major 2,500 home development in North East Cardiff

    June 26, 2026

    McFly thrill Cardiff Castle crowd with nostalgia packed performance

    June 26, 2026

    Pete Tong brings Ibiza Classics party to packed Llangollen Pavilion

    June 26, 2026
    Follow 247
    • Facebook
    • Twitter
    • YouTube
    • LinkedIn

    247 Newsletter

    Sign up to get the latest hand-picked news and stories from across Wales, covering business, politics, lifestyle and more.

    Wales247 provides around the clock access to business, education, health and community news through its independent news platform.

    Email us: [email protected]
    Contact: 02922 805945

    Facebook X (Twitter) YouTube LinkedIn RSS
    More
    • What’s On Wales
    • Community
    • Education
    • Health
    • Charity
    • Cardiff
    • Swansea
    Wales Business
    • Business News
    • Awards
    • Community
    • Events
    • Opinion
    • Economy
    • Start-ups
    • Home
    • About
    • Advertise
    • Picture Desk
    • Privacy
    • Corrections
    • Contact
    © 2026 Wales 247.

    Type above and press Enter to search. Press Esc to cancel.