Close Menu
    Facebook X (Twitter) Instagram
    Wales 247
    • Cymru
    • FindMyTown
      • South East Wales
      • South West Wales
      • Mid & West Wales
      • North East Wales
      • North West Wales
    • Business
    • Education
    • What’s On
    Facebook X (Twitter) LinkedIn
    • Senedd 2026
    • Cardiff
    • Swansea
    • Charity
    • Motoring
    • Got a story?
    • Advertise
    • Property
    • Cornered
    • Life
    Wales 247
    Home » Llanharan sustainable transport corridor to progress
    Rhondda Cynon Taf

    Llanharan sustainable transport corridor to progress

    Rhys GregoryBy Rhys GregoryMarch 19, 2024No Comments
    Share Facebook Twitter Copy Link LinkedIn Email WhatsApp
    Road works (Adobe Stock)
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    RCT Council has confirmed that over the last year, the Council has been working closely with Welsh Government and Transport for Wales (TfW) to review the Llanharan Link Road, which was paused under the Welsh Government’s Roads Review.

    Reconsideration of the proposed scheme, working in alignment to the new Welsh Government requirements for sustainability, has allowed the Council to work closely with Transport for Wales to re-design the scheme.

    The re-designed scheme will deliver a new link road to help remove HGVs and heavy traffic through the village of Llanharan.  However the new scheme will have public transport and active travel – with over 4km of active travel links – embedded in its principles.

    The new scheme will also see a 30% – 35% reduction in embedded carbon.  Crucially, the footprint of the scheme will reduce by 45% and there will be no loss to local ancient woodland. The overall scheme will also see an enhancement of biodiversity in line with Planning Policy Wales guidance.

    Traffic lights and junctions will have bus priority measures, whilst the local communities will be served by an enhanced bus service of 4 buses per hour.

    Leader of RCT Council, Councillor Andrew Morgan OBE, said: “Through months of close working between RCT Council, Welsh Government and Transport for Wales, we believe that we now have a much better scheme which both meets the needs of the local community and more closely aligns with the Welsh Government’s transport strategy.

    “The scheme is designed to have sustainable transport at its heart with both public transport and active travel embedded as core priorities.

    “There is still more work to be done to finalise the scheme before we progress for planning permission, and during this next phase more challenge and refinement of the scheme will be undertaken to ensure that Llanharan sees a truly sustainable transport corridor delivered.”

    The Deputy Minister for Climate Change with Responsibility for Transport, Lee Waters added: “I am really encouraged that the team at Rhondda Cynon Taf have risen to the challenge set by our Roads Review panel to reach the higher bar set for building roads in the future.

    “They have gone back to the drawing board and designed a scheme that provides the connectivity they originally wanted but in a way that significantly lessens the environmental impact and builds in advantages for public transport, walking and cycling.

    “There’s more work to be done on the final detail but this work shows that we can do things differently in Wales to help tackle the climate and nature emergencies.”

    Llanharan
    Follow on Facebook Follow on X (Twitter) Follow on LinkedIn
    Share. Facebook Twitter LinkedIn Email WhatsApp Copy Link
    Avatar photo
    Rhys Gregory
    • X (Twitter)
    • Instagram
    • LinkedIn

    Editor of Wales247.co.uk

    Related Posts

    Cardiff backs workplace parking levy as congestion charge plans shelved

    July 16, 2026

    Fire breaks out at Llantrisant Recycling Centre as smoke warning issued

    July 16, 2026

    Woman jailed after police uncover Rhondda drug line

    July 15, 2026

    Comments are closed.

    Latest News in Wales

    Cardiff backs workplace parking levy as congestion charge plans shelved

    July 16, 2026

    Overnight A4232 closure in Cardiff for urgent tree safety work

    July 16, 2026

    Welsh Water warns hosepipe ban could begin this weekend

    July 16, 2026

    Morning rush hour delays on M4 between Junctions 24 and 23A

    July 16, 2026

    Swansea copperworks restoration reaches major new milestone

    July 16, 2026

    Breedon invests £1m in Welsh Slate quarry to boost production

    July 16, 2026

    Persimmon Homes East Wales appoints new Construction Director

    July 16, 2026

    Cardiff Bay’s Mermaid Quay to host free summer holiday events

    July 16, 2026

    Quantum Advisory promotes Cardiff pensions expert to Principal Consultant

    July 16, 2026

    Family remembers beloved husband and dad with tribute at Cardiff Castle

    July 16, 2026
    Follow 247
    • Facebook
    • Twitter
    • YouTube
    • LinkedIn

    247 Newsletter

    Sign up to get the latest hand-picked news and stories from across Wales, covering business, politics, lifestyle and more.

    Wales247 provides around the clock access to business, education, health and community news through its independent news platform.

    Email us: [email protected]
    Contact: 02922 805945

    Facebook X (Twitter) YouTube LinkedIn RSS
    More
    • What’s On Wales
    • Community
    • Education
    • Health
    • Charity
    • Cardiff
    • Swansea
    Wales Business
    • Business News
    • Awards
    • Community
    • Events
    • Opinion
    • Economy
    • Start-ups
    • Home
    • About
    • Advertise
    • Picture Desk
    • Privacy
    • Corrections
    • Contact
    © 2026 Wales 247.

    Type above and press Enter to search. Press Esc to cancel.